Lakeside Garden Grove Homeowners Association
  • Home
  • Calendar
  • Board / Mgmt.
  • Parking / Patrol
  • Policies / Forms
  • Governing Docs
  • News / Map
    • News
    • Map
    • Newsletters
    • Minutes / Agendas
    • Frequently Asked Questions (FAQ)
    • Important Numbers
    • Image Gallery
  • Refurbishment
  • Disaster Preparedness
Home» News (Page 23)

News

Be Wary During Construction

Posted on July 19, 2013 by Lakeside HOA in News, Refurbishment

refurbishment-lakeside-condosHomeowners should use extra caution during the construction project. For safety’s sake, all residents should be aware of the location of workmen and power cords, steer clear of active construction and material storage areas and obey all signage. Please avoid conversations with workers, unless necessary, so that they do their jobs uninterrupted and safely.

If a homeowner witnesses any worker activity that you feel the contractor should know about, please call (or visit) Lucia Miranda, project coordinator, at the construction office on the east side of the complex, or call Kyle Brito, the general contractor’s superintendent for the refurbishment project, both at 714-638, 8342, or call Dale Meredith at 949-250-3910. You also can email Meredith at dalemeredith@dbuild.com.

Flat Roof Notices and Construction

Posted on July 19, 2013 by Lakeside HOA in News, Refurbishment

Flat roof construction is substantially complete in the 11 buildings listed below. If you need to have a service vendor perform work on a completed building, you may proceed but please do so in accordance with Lakeside’s rules and regulations.

Please make sure to notify Optimum’s maintenance coordinator Mark Gardner so that roof access can be arranged.
You can reach Mark at (714) 508-9070 x287 or by email at mgardner@optimumpm.com)

The completed buildings are:
10530, 10540, 10570, 10560, 10610, 10620, 10520, 10550, 10590, 10621, 10631

 

What is the Refurbishment Project for Lakeside?

Posted on July 10, 2013 by Lakeside HOA in News, Refurbishment
What is the Refurbishment Project for Lakeside?

The project is a comprehensive effort to fix what ails our community. The basic purpose is to repair, replace and refresh the infrastructure and appearance.  It includes, but isn’t limited to, replacing deteriorated balconies and damaged patios, staircases,  utility room doors, pathways, gates and much more.

Our community is 31 years old, and many of the basic parts of our infrastructure have eroded over the passage of time.  These items need to be repaired or replaced. Because of that, there is a need to address these problems with a comprehensive plan rather than a piecemeal approach that could take many years to complete and will be more costly.

The project aims to fix all these problems in a span of 9 months to a year. Once done, our community would be safer, more modern and more attractive.

Top 5 Reasons for Refurbishment

Posted on July 10, 2013 by Lakeside HOA in News, Refurbishment

1. Repair and replace infrastructure

  • It will replace badly decayed balconies and patios that now can pose a risk for bodily injury.
  • It will replace rotted bridges, remove trees uprooting cracked sidewalks, replace trash doors and fix many other things.

2. Improve Security

  • It will repair outdated gate systems that are becoming costly to maintain.  New gates will assist in preventing unwanted outsiders from accessing our property, using our pools, trashing our grounds and committing crimes.

3. Could help keep our HOA monthly dues from increasing and could help build up our reserves for future repair and maintenance.

4. Help beautify our community with a fresh coat of paint, new signage and new landscaping features.

5. Improve property values:

  • An updated community will be attractive to buyers if you choose to sell in the future.

Final Town Hall Meeting

Posted on July 10, 2013 by Lakeside HOA in News, Uncategorized

Refurbishment Project 

The final Town Hall meeting will be held February 28 from 6:30 p.m. until 8:30 p.m. at the Garden Grove Community Center, 11300 Stanford Ave., Garden Grove, CA in Great Room A.

It is crucial for every homeowner to attend. Valuable information   regarding your property will be available.  Dale Meredith, the project manager for Design Build Associates will be communicating the financial picture.  If you have any  questions beforehand, you can email them to Design Build Associates at   www.dalemeredith@dbuild.com.  

  • «
  • ‹
  • 21
  • 22
  • 23

(c) 2018 Lakeside Garden Grove Homeowners Association